pond » days 22 and 23
I didn't get hardly anything done the last week until the weekend, so I will count this as two days. This weekend, I filled in around the bottom drain so I could install the TPR pipe. I also ran more skimmer piping, finished BD and diffuser piping to the vortex pit. I put skippy back in place for another test (I think it still leaks). I unrolled the liner and installed the liner ring on the bottom drain. Last, I installed the sump pump in the drain barrel.