Previous photo Next photo Thumbnail page
pond » day 15
01_skippy 02_cone_layout 03_cone_done 04_pit
First page Previous page Index page Next page Last page
03_cone_done  [3 of 4]


Click to show/hide keyboard shortcut help
Keyboard shortcuts are active:

RIGHT arrow - next page
LEFT arrow - previous page
Page Up - index page
HOME - first page
END - last page
ESC,S,s - toggle start/stop slide show
ExhibitPlus 03_cone_done Here it is, 4 hours of work :p I measured the bottom of the barrel instead of where the top of the cone would be, which was a different by over an inch. To fix it, I cut an extra piece to make the difference and spent a lot of time putting the cone in and pulling out of the barrel to get the fit correct. The duct tape handles were much appreciated for putting in/pulling out. I used duct tape to temporarily hold the extra piece before finally riveting it in place.
Here it is, 4 hours of work :p I measured the bottom of the barrel instead of where the top of the cone would be, which was a different by over an inch. To fix it, I cut an extra piece to make the difference and spent a lot of time putting the cone in and pulling out of the barrel to get the fit correct. The duct tape handles were much appreciated for putting in/pulling out. I used duct tape to temporarily hold the extra piece before finally riveting it in place.

FILE NAME: 03_cone_done.jpg  |  DATE: 9/1/05 12:08 AM  |  CAMERA: SEIKO EPSON CORP. (PhotoPC 800)  |  RESOLUTION: 1600 x 1200  |  NATIVE FOCAL LENGTH: 7.0mm  |  FLASH: Flash fired  |  EXPOSURE TIME: 2/61 sec  |  METERING MODE: Multi-segment  |  APERTURE: F2.4  |  ISO SETTING: 100

01_skippy 02_cone_layout 03_cone_done 04_pit
First page Previous page Index page Next page Last page